Tuesday, 21 January 2014


BPP-MM-01 (Material Master)

 

Overview

 

Material Master must be created for all materials for which stock has to be maintained. Material master to be created for Assets and other direct  materials as well. This BPP is to be used only to create bought out material such as BOP, RM , Spares, consumables etc .

 

 Procedure Steps

Access transaction by:

Via Menus
a)    Logistic->Material Management->Material Master->Create General ->Immediately
b)    Logistic->Material Management->Material Master->Change
c)    Logistic->Material Management->Material Master->Display
Via Transaction Code
a)    MM01
b)    MM02
c)    MM03
 
List of reports
a)    MM60
 

For creation of material master use T Code- MM01 or Select as shown below:
 
For creation of material master use T Code- MM01 or Select as shown below:
 
 On screen “Create Material: Initial Screen”, enter information in the fields as specified in the below table:

Put the Material Code as per codification logic

 



Always select (M), as industry sector

 



Select the type of material you want to create. But the material type should be of Z type or it must start from Z.

 
         

 


Field Name

Description

R/O/C

User Action and Values

Comments

Material

Material Number

R

Enter Material Number

 

Industry Sector

Industry Type

R

Select from Pull-Down Window -Mechanical Engg

 

Material Type

Type of material

R

Select from Pull-Down Window

 

 

 

 

 

 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Click on “ Enter”
 
On screen “Create Material: Initial Screen : Select view(s)”, enter information in the fields as specified in the below table:

Select the views by clicking here and selection of views is according to material type being created

 

 

S.NNO

Material type

Select views

1

ZBOP, ZBOC, ZJNF, ZSPR, ZTNM, ZRMT, ZNBC

Basic Data, Purchasing , Foreign Trade ,MRP ,

General Plant Data ,Quality Management ,Accounting ,Costing

2

ZBIN

Basic Data ,Sales , Foreign Trade, Purchasing , Foreign Trade , General Plant Data

3

ZFGP

Basic Data ,Sales , Foreign Trade, MRP , Work Scheduling, General Plant Data , Quality Management ,Accounting ,Costing

4

ZMCN

Basic Data, Purchasing , Foreign Trade , Accounting ,Costing

5

ZNOV

Basic Data ,Sales , Foreign Trade, MRP , General Plant Data , Quality Management

7

ZPKG

Basic Data ,Sales , Foreign Trade

 

8

ZSFG,ZIHP

Basic Data, MRP , Work Scheduling, General Plant Data , Quality Management ,Accounting ,Costing
NOTE: Classification View is maintained in case of batch manage item
 

Field Name

Description

R/O/C

User Action and Values

Comments

 

 

 

 

 

Selection of view

Basic Data, Purchasing, General Plant data, MRP, Accounting, Costing

R

Select all view by clicking

 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Press  “ Enter” ” or click “
On screen “Create Material: Initial Screen : Organizational Levels”,, enter information in the fields as specified in the below table:  
 

Select the plant and storage location where we want to store the material

 
                       

 
 

Field Name

Description

R/O/C

User Action and Values

Comments

 Plant

Plant code

R

Type or select from LOV

 

Sales Org.

Sales Organization

R

Type or select from LOV

 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Press “Enter” or click “
On screen “Create Material: Basic data 1”, display information in the fields as specified in the below table. 
 

Put the gross & net weight for the BOM material

 



Select the unit of measure

 



Select the material group of the material

 

 
 
         

Field Name

Description

R/O/C

User Action and Values

Comments

Description

Material description /Name

R

Type the material description

 

Base unit of measure

Unit of measure in which stock of the material are managed.

R

Select from LOV or press F4

 

Material Group

Material Group which the material assigned

R

Select from LOV or press F4

 

Old material Number

Old material number

O

Type the old material number

 

Ext. Mtl Group

External Material Group

O

Select from LOV or press F4

 

Division

Division

O

Not required to fill in BOP and SFG

 

Lab/Office

Laboratory/design office

O

Select from LOV or press F4

 

X-Plant Matl. Status

Cross-Plant Material Status

O

Select from LOV or press F4

 

Gross Weight

Gross Weight of the Material

C

Type the Gross Weight of the Material

 

Weight Unit

If you specify a weight, you must enter the corresponding unit of weight here.

C

Type the Weight Unit of the Material

 

Net Weight

Net Weight of the Material

C

Mandate in case of BOM Parts

 

 

 

 

 

 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional
Press  “ Enter” or click “
 
On screen “Create Material: Purchasing”, display information in the fields as specified in the below table. 

Write the description of material here

 



Put the Good Receipt Processing time of the material

 



In case of BOM material tick here

 



Always select (1) as purchasing value key

 

 

Field Name

Description

R/O/C

User Action and Values

Comments

Order Unit

Purchase Order Unit of Measure

C

Select from LOV or press F4

 

Purchasing Group

A buyer or a group of buyers, who is/are responsible for certain purchasing activities

R

Select from LOV or press F4

 

Material Group

To which Group the Material belongs to

R

Select from LOV or press F4

 

Plant sp.matl status

Plant-Specific Material Status

O

Select from LOV or press F4

 

Valid From

Date from which the plant-specific material status is valid

O

Select from LOV or press F4

 

Tax ind.f. material

Tax indicator for material.

O

Select from LOV or press F4

 

Qual.f.freeGoodsDis.

Specifies whether and for what areas the material qualifies for a discount in kind.

O

Select from LOV or press F4

 

Material freight gp.

Material Freight Group with specified class

C

Select from LOV or press F4

 

Autom.po

Automatic po allowed

C

Select the check box

Defines that purchase orders are generated automatically when purchase requisitions are converted into purchase orders.

Batch Management

Batch management

C

Select the check box

It is required only if for batch is required

Purchasing value key

Purchasing key value(Reminder set of day for purchasing)

R

Select from LOV or press F4

 

GR Processing time

Good receiving/processing  time

R

Enter the time of GR processing in days

Number of workdays required after receiving the material for inspection and placement into storage.

 

Quota arr. usage

Quota arrangement usages

C

Select 4 from LOV

It is required in case quota arrangement is used

Post to insp. stock

Post to Inspection Stock

 

C

Select the check box

It is required  whether the material is subject to quality inspection

Critical Part

Indicator for critical part

C

Select the check box

It is required for critical part if inventory is required

Source List

Indicator for source list

R

Select the check box

It is optional in case of non BOM parts

JIT sched. Indicator

Indicator: Item Relevant to JIT Delivery Schedules

C

Select from LOV or press F4

 
 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
 Press  “ Enter” or click “
On screen “Create Material: MRP 1”, display information in the fields as specified in the below table. 

Select the lot size according to the planning of the material

 



Select the MRP Controller responsible for the material planning

 



Select the MRP type, it determines that how the material is planned

 

 

Field Name

Description

R/O/C

User Action and Values

Comments

MRP Group

Material Requirement Planning Group

C

Select from LOV or press F4

It is required for material planning

ABC Indicator

ABC Indicator if class of material

R

Select from LOV or press F4

 

MRP Type

MRP Type

R

Select from LOV or press F4

The reorder point is important only for reorder point planning

Reorder Point

If the stock falls below this quantity, the system flags the material Planning.

 

O

Enter the reorder qty

-do-

Planning time fence

The planning time fence specifies a period within which no automatic changes are to be made to the master plan

C

Enter the no of days for planning time fence

 

Planning cycle

The planning cycle is a planning calendar that is defined in Customizing for MRP

C

Select from LOV or press F4

 

MRP Controller

MRP Controller

C

Select from LOV or press F4

The reorder point is important only for reorder point planning

Lot Size

Lot size

C

Select from LOV or press F4

-do-

Minimum Lot Size

Minimum procurement quantity

 

C

Enter the minimum qty

 

Maximum Lot Size

Maximum procurement quantity

 

C

Enter the maximum qty

Quantity that is not allowed to be exceeded during procurement

Fixed Lot Size

Quantity that will be ordered or produced in the event of a shortage.

O

Enter the fixed qty

 

Maximum stock  level

Quantity of the material in this plant that may not be exceeded.

O

Enter the maximum stock level qty

 

Ordering cost

Costs that are incurred, irrespective of lot size, for each purchase order or production order over and above the purchase order price or production costs.

O

Enter the ordering cost in plant currency

 

Storage cost ind.

Storage cost indicator

O

Select from LOV or press F4

The storage costs percentage is used by optimizing lot-sizing procedures to calculate the lot size, but not for any other purpose.

 

Assembly scrap (%)

Percentage scrap that occurs during production of the material if the material is an assembly.

O

Enter the scrap % during production

The assembly scrap is used in materials planning to calculate the lot size of the assembly. The system increases the quantity to be produced by the scrap quantity calculated.

Takt time

Takt time

O

Enter the takt time in workdays

 

Rounding Profile

Key that the system uses to adjust the order proposal quantity to deliverable units

O

Select from LOV or press F4

 

Rounding Value

Value to a multiple of which the system rounds up the procurement quantity

R

Enter the rounding value

The rounding value is used in the planning run

Unit of measure grp

Unit of measure group

O

Select from LOV or press F4

Key that you can use for grouping several units of measure
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Press  “ Enter”
On screen “Create Material: MRP 2”, display information in the fields as specified in the below table. 

Always select (000) as schedule margin key

 



Select special procurement according to the type of material. Select 30 in case of subcontracting material

 



Select the Procurement type of the material

 

 

Field Name

Description

R/O/C

User Action and Values

Comments

Procurement Type

Material Procurement type

R

Select from LOV or press F4

 

Batch Entry

Batch entry in the production/process order

O

Select from LOV or press F4

 

Special Procurement

Special Procurement Type

C

Select from LOV or press F4

Put 30 in case of procurement

Prod. Stor. location

Issue storage location

O

Select from LOV or press F4

 

Default supply area

Proposed supply area

C

Select from LOV or press F4

In case of KANBAN

Backflush

Back flush indicator

C

Select from LOV or press F4

 

Storage loc. For EP

Default storage location for external procurement

R

Select from LOV or press F4

 

Stock det. Grp

Stock determination group

O

Select from LOV or press F4

 

Bulk material

Indicator for bulk material

O

Select the check box

It is for the bulk material which you want directly to your work center

Planned Deliv. Time

Planned Delivery  Time in days

C

Enter the delivery time in days

 

Planning Calendar

Planning Calendar

C

Select from LOV or press F4 defined calendar

 

SchedMargin key

Scheduling Margin Key for Floats

C

Select from LOV or press F4

 

Safety Stock

Safety stock qty

R

Enter the safety stock

Specifies the quantity whose purpose is to satisfy unexpectedly high demand in the coverage period.

Service level (%)

Percentage specifying what proportion of the requirement is to be covered by the warehouse stock.

C

Enter the % of stock

 

Min Safety Stock

Minimum Safety stock qty

R

Enter the safety stock

The quantity that defines the lower limit for safety stock.

Coverage profile

Range of coverage profile (Days for Safety stock)

C

Select from LOV or press F4

The range of coverage profile contains the parameters for calculating the dynamic safety stock.

Safety time ind.

Safety time indicator with or without material

C

Select from LOV or press F4

You use this indicator to switch on the safety time actual range of coverage for a material in MRP.

 

Safety time/act.cov.

Safety time / actual range of coverage

C

Enter the days

 

 

 

 

 

 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Press  “ Enter”
On screen “Create Material: MRP 3”, display information in the fields as specified in the below table. 

Always select 02 as availability check

 

 

Field Name

Description

R/O/C

User Action and Values

Comments

Period indicator

Indicator specifying the periods in which the material's consumption

R

Select from LOV or press F4

 

Fiscal Year Variant

Fiscal Year Variant  define the fiscal year

O

Select from LOV or press F4

 

Splitting indicator

Splitting indicator for forecast requirement

O

Select from LOV or press F4

Indicator that defines how the system splits forecast requirements into smaller time intervals where the MRP type is forecast-based planning and the period indicator is not "Day".

Strategy Group

Planning strategy group

R

Select from LOV or press F4

Used for finished good

Consumption Mode

Consumption Mode

O

Select from LOV or press F4

 

Bwd Consumption per.

Backward Consumption period

O

Enter the backward consumption period in days

 

Fwd Consumption per.

Forward Consumption period

O

Enter the forward consumption period in days

 

Availability check

Checking group for material availability

R

Select from LOV or press F4

 

Tot.repl. lead time

Total replenishment lead time (in workdays)

C

Enter the day for the replenishment lead time

There is no point in maintaining the Total replenishment lead time field for materials procured externally.

 

 

 

 

 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
 
On screen “Create Material: MRP 4”, display information in the fields as specified in the below table. 
 
Press  “ Enter
On screen “Create Material: Plant Data /Stor. 1”, display information in the fields as specified in the below table. 

Select Minimum Remaining and Total Shelf life for BOP Material

 

 

Field Name

Description

R/O/C

User Action and Values

Comments

Unit of issue

Unit in which the material is issued from the warehouse.

R

Select from LOV or press F4

 

Storage Bin

Storage bin within a storage location where the material is stored.

O

Enter the storage location in warehouse

 

Picking Area

Picking area for lean warehouse management

O

Select from LOV or press F4

 

Temp. Conditions

Temperature conditions for the material

O

Select from LOV or press F4

 

Storage conditions

Storage conditions for the material

O

Select from LOV or press F4

 

Container reqmts

Container requirements for the material to be shipped or stored

O

Select from LOV or press F4

 

Haz. Material number

Hazardous material number

O

Select from LOV or press F4

It is for dangerous materials

CC phys. Inv. Ind.

Physical inventory indicator for cycle counting

O

Select from LOV or press F4

Indicates that the given material is subject to the cycle counting method of inventory.

CC Fixed

CC indicator is fixed

O

Select the check box

 

Number of GR slips

Quantity: Number of GR/GI slips to be printed

 

O

Enter the required no of slips

 

Label type

Required Label type

O

Select from LOV or press F4

 

Lab Form

Label form (size and layout of the label)

O

Select from LOV or press F4

 

Appr.Batch rec.req.

Approved batch record required

O

Select the check box

 

Max. storage period

Maximum period for which the material may be stored.

C

Enter the period

It is required for self life items

Time unit

Unit in which the maximum storage period of the material is measured.

O

Select from LOV or press F4

-do-

Min.Rem. Self Life

Minimum remaining self life (Minimum amount of time for which the material must keep upon goods receipt for the goods receipt to be accepted by the system.)

C

Enter the time

-do-

Total self life

Total self life (Period for which the material will keep in total, that is, from the date of production to the shelf life expiration date.)

C

Enter the time

-do-

Period ind. For SELD

Period Indicator for Shelf Life Expiration

 

C

Select from LOV or press F4

-do-

Rounding rule SELD

Rounding rule for calculation of SLED

C

Select from LOV or press F4

-do-

Storage percentage

Storage percentage left

C

Enter the percentage of remaining self life

Percentage specifying how much of the minimum remaining shelf life must be left
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Press  “ Enter
On screen “Create Material: Quality Management”, display information in the fields as specified in the below table. 

Select QM Control key and target QM system for QM active material

 

On screen “Create Material: Accounting 1”, display information in the fields as specified in the below table. 

Standard price is updated when costing is run

 



Don’t put moving price. It is updated at the time of receiving of materials

 



Select valuation class for the material as Domestic or Import

 

click the  and fill the planned price and date

After putting the planned price & date, click here at OK

 
 

 

Field Name

Description

R/O/C

User Action and Values

Comments

Valuation category

Valuation category for stock evaluation

R

Select from LOV or press F4

 

Valuation Class

Valuation Class

R

Select from LOV or press F4

Default value for the valuation class for valuated stocks of this material.

VC:Sales order stk

Valuation Class for Sales Order Stock

 

C

Select from LOV or press F4

It is required only if stock valuation class is different from assigned valuation class

Price Control

Price control indicator

R

Select from LOV or press F4

 

Moving price

Moving average price of the material

O

It is system calculated

 

Standard Price

Standard price of the material

O

Enter the standard price for the material

 

Future price

Future price

O

Enter the future price of the material

 

Valid from

Date as from which the future price of the material is valid.

 

C

Select from LOV or press F4

It is mandate when future price is entered

previous period year

previous period year

O

Select from LOV or press F4

 

Std.cost estimate

Standard cost estimate

R

Select from LOV or press F4

 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Press  “ Enter
On screen “Create Material: Costing 1”, display information in the fields as specified in the below table. 

Select Origin Group of material as In house , Domestic or Import

 



Always select Overhead group as SAP1

 



Tick here, at material origin

 



Select Profit center of your plant

 

 
 

Field Name

Description

R/O/C

User Action and Values

Comments

Do Not Cost

Indicator for do not cost

C

Select the check box for activation

 

Overhead Group

Costing overhead group

C

Select from LOV or press F4

 

Profit Centre

Profit centre

R

Select from LOV or press F4

 
(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)
Press  “ Enter
Save by clicking on the ‘Save’   Icon.
 